Runcorn · What Is Asked of You

What Should I Expect From a Complete New Roof Installation?

Most guides describe what the roofers do. This one covers the other half: the decisions that will land on you, when they land, and what you should end up holding.

We have written up what happens on site day by day, and how long each stage takes — see what happens during a complete re-roof and how long it takes.

This one is deliberately from the other side of the fence. What will be asked of you, when, and what you should have in your hands when it is finished.

Before You Accept a Quotation

The decisions that belong here

These are unhurried, and they should all be settled before anything is ordered, because changing them later is expensive.

  • The covering — named by manufacturer and range, or by producer and grading on slate.
  • The fittings. Ridge, hip and verge systems vary a lot in how conspicuous they are. Ask to see a photograph of a finished roof using them.
  • What shares the scaffold. Chimney repointing, fascias, soffits, guttering, high-level pointing. Cheap now; each carries its own access later.
  • The insulation route, and the ventilation that goes with it.
  • The rate for defective timber, in writing. This is the one item nobody can price in advance, and agreeing it now is what stops it becoming a dispute later.

The checks that belong to you

  • Whether the address is inside the Higher Runcorn conservation area — Halton Borough Council can confirm it. Only relevant if the appearance is changing.
  • Whether the property is listed.
  • Public liability insurance, and that the certificate is current.
  • Who actually carries out the work — employed teams or subcontractors — and who honours the guarantee if the firm changes hands.

Before the Start Date

Short, practical, and easier done in advance than on the morning.

  • Clear the loft, or at least everything under the slopes. Dust and debris come down during a strip, and anything left up there will be covered.
  • Move cars off the drive for the duration, and agree where the skip and the materials will sit.
  • Take down anything fixed high on the walls — hanging baskets, satellite dishes, security lights — or agree who does.
  • Move or protect what is directly below the eaves, including greenhouses, garden furniture and anything fragile.
  • Tell the neighbours, especially where the scaffold oversails or where you share a boundary.
  • Plan for pets. The noise during a strip is considerable and cats in particular tend to disappear for the week.
  • Tell your insurer that work is planned.
One thing worth asking about specifically: where the scaffold will stand. If it needs the public footway, a licence is required from Halton Borough Council and that is frequently the longest lead time on the whole job. It should be applied for at booking, not at the start date.

While the Work Is On

What you should expect

  • The roof stripped in manageable sections and never left wholly open
  • Open areas sheeted overnight and in poor weather
  • Material chuted or lowered into a skip, not dropped off the scaffold
  • A tidy site at the end of each day
  • Someone able to tell you what is happening tomorrow

The one decision that will arrive mid-job

Timber. Once the covering is off, the rafters, purlins and wall plates are visible for the first and only time, and anything defective has to be dealt with before the roof is closed up.

You should be shown what was found, told what it will cost at the rate already agreed, and given the decision. What you should not get is a larger invoice at the end with an explanation attached.

What should not happen

  • A request for a large payment before work has meaningfully started
  • Verbal variations to the scope with nothing in writing
  • Old lead disappearing with no conversation about it — it has real scrap value, and a contractor keeping it is fine, provided it was discussed
  • Insulation stuffed hard into the eaves, sealing the ventilation path
  • Ridge or hip bedded in mortar alone, with no mechanical fixing

At Handover

Before the scaffold comes down, walk round with whoever ran the job:

  • Gutters cleared and tested with water
  • Lead at every junction, dressed rather than mastic-filled
  • Ridge and hip mechanically fixed
  • Ventilation visible at the eaves and at high level
  • Verges finished as agreed
  • The loft dry, and the insulation clear of the eaves path

Then the site: cleared, and swept with a magnet for nails. A re-roof produces an extraordinary number of old nails and they end up in the drive and the lawn.

The Four Documents to Keep

  • The building regulations compliance certificate. A buyer's solicitor will ask for this, and not having it is a real problem at sale.
  • The written guarantee — what it covers, for how long, and who honours it.
  • Any manufacturer warranty on the covering.
  • Photographs of the structure before it was closed up. They cost nothing and they are your only record of a part of your house nobody will see again for decades.
Ask for all four at handover rather than chasing them later. The moment to establish who is sending what is while the scaffold is still up.

The Regulations, in Brief

Two separate systems. Planning: a like-for-like re-roof does not materially affect the external appearance of a building, so under section 55 of the Town and Country Planning Act 1990 it is not development at all and needs no permission. A visible change of covering can be a different matter, particularly inside a conservation area, where the test is applied more tightly.

Building regulations: where more than 50% of the roof's surface area is renewed, or the work forms part of a major renovation, regulation 23 of the Building Regulations 2010 requires the roof to be brought up to current thermal standards so far as that is technically, functionally and economically feasible — 0.16 W/(m²K) for a roof in an existing dwelling. A patch repair does not trigger it, and neither does a roof over unheated space such as a detached garage.

Halton Borough Council can confirm the conservation area and listing position for a specific address at no cost. The full local position is on our Runcorn page. If your property is in Wales, see Flint or Deeside — the figures there are different.

Know What You Are Signing Up For

We set the decisions out in advance so none of them arrives while a scaffold is already up.

More New Roof Advice for Runcorn

New roof installations in Runcorn →
All new roof guides →
New Roof Installations Chester →

Questions

Quick Answers

What decisions will I have to make, and when?
The covering and the fittings before anything is ordered; the optional extras that share the scaffold at the same time; and, once the roof is open, whether to authorise timber repairs. The first two are unhurried. The third is not, which is why the rate for it should be agreed in writing beforehand.
Do I need to tell my neighbours?
It is courteous, and it is practical where a scaffold needs to oversail their land or where the work involves a shared boundary or a stack on a party line. Some work touching a party wall requires formal notice, so it is worth establishing at quotation stage.
Should I tell my insurer?
Let them know work is planned. Most policies are unaffected by routine roofing, but a building left open, or scaffolding on site, is the sort of thing an insurer prefers to hear about in advance rather than after a claim.
What should I have at the end?
A building regulations compliance certificate, a written guarantee that says what it covers and who honours it, any manufacturer warranty on the covering, and photographs of the structure before it was closed up. Keep all four — a buyer's solicitor will ask.
Areas We Cover

New Roof Installations in Runcorn and Across the Area

Complete new roofs, re-roofing and roof replacement across Chester, the Wirral, Deeside and the surrounding areas.

Free Quotation

Request a Quotation in Runcorn

Tell us about the property and the roof in Runcorn, and we will come back to you — usually the same day.

Prefer to talk? Call 07464 259566 · WhatsApp 0044 7464 259566 · Email Evensbuddy@yahoo.com